Transforming Engineering & Manufacturing

 

Demonstration

 


The following is a demonstration outline / timeline that will illustrate the time savings that can be achieved utilizing Global Edge 2011 - Automated Manufacturing:

 

PowerPoint Presentation

Duration:  10 Minutes

 

Automated Quoting and Product Configuration

1.01:  Automated CAD Drawing Analysis

1.02:  Automated Routing Generation

1.03:  Automated Sales Quote Generation / Product Configuration

1.04:  Automated CAD Drawing Generation / ERP Interface

1.05:  Advanced Bill of Materials Management

Duration:  30 Minutes

 

Open Discussion / Review

Duration:  20 Minutes

 

Schedule Online Demonstration